Projects

Portfolio

Explore selected FEL projects and work in industrial and commercial electrical equipment.

Aug 10, 2026, 2:48 PM

Addition of Side Columns for a New QED Column

Addition of two columns on either side of a new QED column to accommodate supply from two separate sources. A manual interlock system was incorporated to ensure controlled source s…

Read more

Aug 10, 2026, 2:01 PM

2000 A ATS

2000 A automatic transfer switch assembly for a commercial or industrial electrical distribution application. The equipment is arranged in a two-section enclosure with front-access…

Read more

Aug 10, 2026, 1:55 PM

4000A 480V ATS for Hydro-Québec and Seven Synchronized Natural Gas Generators

This project involved a 4000A, 480V automatic transfer switch (ATS) with one source from Hydro-Québec and a second source from seven synchronized natural gas generators . It was de…

Read more

Aug 10, 2026, 1:44 PM

Retrofit of 3 NOARK Breakers and Addition of ATS System for a Data Center

Retrofit of three NOARK circuit breakers and addition of an automatic transfer switch (ATS) system for a data center electrical installation. The equipment was integrated into a sw…

Read more

Aug 10, 2026, 12:39 PM

3000A Electrical Service Entrance with Integrated ATS, Designed by FEL

FEL designed and built this 3000 A electrical service entrance with an integrated automatic transfer switch (ATS) for a commercial and industrial application. The project included…

Read more

Aug 10, 2026, 12:31 PM

Column Added for Tenant Metering

FEL added a column to integrate a meter drawer, allowing a building section to be metered for a tenant. The assembly was configured to support the required metering arrangement wit…

Read more

Jun 10, 2026, 5:46 PM

Temporary 600A 25 kV Substation with Hydro-Québec Compliant Metering

We were called on to provide a 25 kV substation for a temporary power arrangement. FEL built a weather-tight enclosure that met Hydro-Québec requirements for the integration of thi…

Read more

Jun 10, 2026, 5:01 PM

5000A 600/347V Square D Custom Switchboard

Our client was facing a lead time of more than 52 weeks, so FEL supplied a custom Square D 5000A, 600/347V, 7-section incoming lineup using a combination of new and used circuit br…

Read more

Jun 10, 2026, 12:21 PM

Retrofit of Four 1600A Masterpact Breakers

As part of an emergency work project, FEL carried out the retrofit of four 1600A, 600 V Masterpact breakers supplied from stock and ready to install. The arc flash study was not co…

Read more